Tunnel Systems
Express & Full-Service Tunnel Equipment
Coleman-Hanna engineers some of the most reliable tunnel car wash equipment in the industry. From compact express tunnels to full-service trim packages, our Tunnel Systems lineup is built for high-volume sites that demand consistent throughput, predictable maintenance, and superior wash quality across every vehicle class.
What's in this collection
- Hanna 4-Pack Flex Wrap — four counter-rotating 70" brushes in just 13 feet of conveyor space.
- 104" Hanna Tire Glaze with dual-head pump and exclusive drip manifold for even chemical distribution.
- Positrack Steel Belt Conveyor and Metro Wash 60' Tunnel Trim packages.
- Top brushes, angled side brushes, and high-velocity tunnel dryers.
Every component is designed and supported in Houston, Texas, with same-day parts shipping to every U.S. zip code.
Frequently asked questions
How long does it take to install a Coleman-Hanna tunnel?
Typical 60' tunnel installs run 4–8 weeks depending on site readiness, conveyor type, and trim package. Our CAD team prepares a complete site layout before mobilization.
Will Coleman-Hanna parts retrofit older Hanna tunnels?
Yes. Most current-generation arches, wraps, and dryers are designed to drop into existing Hanna footprints with minor brackets. Contact us with your serial numbers for a quick retrofit check.
What chemicals are recommended for tunnel wraps?
We recommend Sun Seal® Hi-Foam Presoak and Triple-Color Foam paired with Sun Seal® Drying Agent for optimal shine and wrap longevity.